Synthetic execution-contract fixtures

These six documents demonstrate linked metadata. They do not describe a commissioned bench, implemented host-input provider or executed test. Numerical limits are invented fixture values, not recommended operating limits. External references use zero digests and must fail real evidence admission.

Document Demonstrates
Procedure Configure a supply, enable it, measure and assert a scalar value
Bench Device/fixture identity, supply/return nets, shared protective resource and monitored signals
Safety policy Separate allowed inputs, continuous conditions, bounded disable and final verification
Commissioning Exact document pins and categorised qualification evidence fields
Run binding A logical supply/output role mapped to a physical device/channel
Run record Separate body result, terminal outcome and final safety assurance

Hashes between these fixture files are real and checked. External identity, package-lock, input-contract and report references are synthetic. “Passed” values illustrate the record shape; they are not actual qualification or execution results. Both positive and rejected metadata cases are described in the validation report.